<img src="https://www.webtraxs.com/webtraxs.php?id=wt-3d467d44-6c5b-451f-91d5-2f7eb392689c&amp;st=img" alt="">
Home / Automation Blog

Guided Changeover Cuts Cartoner Setup from 90 Minutes to 30

Balluff industrial sensors

When a changeover depends on who does it, setup time and waste swing from shift to shift. Here is how a food producer guided its operators through every change point.

The problem

A maker of nutritional products ran five package sizes on one cartoner, with ten change points for each. Operators set the points by following tick marks on the machine. A changeover took 90 minutes with a skilled maintenance engineer and up to four hours with a less experienced operator. There was no way to confirm the setup before restarting, so mistakes wasted product and packaging.

What they did

It started with the most troublesome part of the machine, the carton magazine. It added a washdown-rated IO-Link master, laser distance sensors and inductive position sensors to read where each adjustable part sits. The operator picks the format on the HMI, and a SmartLight flashes until every part is in place, then turns green. The cartoner's PLC was too old to talk to the IO-Link master, so the master connects through a newer PLC further down the line.

Results Balluff reports

  • Changeover down to 30 minutes, an improvement of at least 65%
  • Less material waste and rework
  • A large drop in after-hours calls to fix changeover mistakes

How NEFF helps

NEFF's engineers can help pick the IO-Link master, sensors and indicator lights for a guided changeover, and plan how to add them to a machine you already run. Start with the change point that causes the most trouble, as this producer did. Talk to a NEFF engineer

Products in this story: Balluff IO-Link master, laser distance and inductive position sensors, SmartLight

Results as reported by Balluff in a published case study. The customer isn't named.