Industrial Automation Blog | NEFF Automation

Cobot Welding Gets a Fabricator Back to Capacity in Days

Written by NEFF Automation | Nov 25, 2026, 5:33:44 PM

When you can't hire welders and the backlog keeps growing, a cobot welder can take on the routine welds. Here is how one fabricator got back to capacity.

The problem

A fabricator of exhaust parts, about 60 people, couldn't hire more welders. At its worst it was 65 days behind on lead times and eight weeks over capacity.

What they did

It added a cobot welder: a Universal Robots UR10e with a welding torch and table. The team had no robot experience and was running parts within 20 minutes of uncrating it.

Results Universal Robots reports

  • Welds at 20 inches per minute with the cobot (MIG), against 2–5 inches per minute by hand (TIG)
  • From eight weeks over capacity back to baseline within days
  • The cobot welder paid for itself after one order
  • The shop's fabricators moved to the more complex welds

How NEFF helps

NEFF supplies Universal Robots cobots for welding, and its engineers can help you decide which of your parts are a good fit for a cobot welder. NEFF runs Universal Robots training for your team, and its Automated Solutions Group can build a complete welding cell. Talk to a NEFF engineer

Products in this story: Universal Robots UR10e

Results as reported by Universal Robots in a published case study. The customer isn't named.